Dave Maxwell
Well-known member
17,000 for 3024 SF concrete. Wow. That is five inch with foam board under and along sides


That's the reason I'm not doing it myself. If it isn't flat, they are redoing it. It has to be flat. I have chassis tables and stuff
What is in your falcon?
Definitely want it flat. Have to lay out my anchoring points for bender. I have a 351 Cleveland cobra jet. Building a 588 BBF for my 70 f100.
He ain't that good.
Based on what??
We can do it lightning. Are you on the BBF forum? Www.429-460.com
>$100/yard for concrete??? I'm paying around $160 in W. PA
My local vendor pricing June/July 2011 was $88/yd delivered to the site. May be different now, but likely still under $100.

West Pennsylvania ?![]()
