Lewisthepilgrim
Well-known member
Goal: To fit my 9'6'' 2 post lift.
I need more space. my plan is to dig 3 12'' sonotubes 48'' deep and attach 6''x6''x10''s to on this side for the framing. Then on the other side, add another 2 feet ontop of the current 8' wall.
on the left and right side of the addition I will re-use the current wall on this side of the building. I will basicly cut it in half, and use 1 half for the left of it, and the other half for the right.
roof: I will completely remove this roof and install a new steeper pitch roof.
whata u guys think? I am going to use as much reclaimed materials as I possibly can to keep this under the $1000 requirement for having to pull a permit. I don't anticipate a problem, as I should have most of the lumber already.
The current walls are only 8'. I will need to raise the far side wall by 2 feet. Whats the best way to do this?
I need more space. my plan is to dig 3 12'' sonotubes 48'' deep and attach 6''x6''x10''s to on this side for the framing. Then on the other side, add another 2 feet ontop of the current 8' wall.
on the left and right side of the addition I will re-use the current wall on this side of the building. I will basicly cut it in half, and use 1 half for the left of it, and the other half for the right.
roof: I will completely remove this roof and install a new steeper pitch roof.
whata u guys think? I am going to use as much reclaimed materials as I possibly can to keep this under the $1000 requirement for having to pull a permit. I don't anticipate a problem, as I should have most of the lumber already.
The current walls are only 8'. I will need to raise the far side wall by 2 feet. Whats the best way to do this?
