FltEngCPO
Well-known member
I'm getting ready to get this off the ground finally! I had some dirt brought in and I have a levee site for my 30' x 40' shop. I have to do footers for code and was planning to do stems walls with my slab. The concrete guy that came to bid the job today suggested that I do a Monolithic slab. From a little looking around and reading posts, I think it would be okay for what I need.
My question is based on my sloped yard and having to bring dirt in to get the site level (which is due to the drainage issues I have in the back yard).
I took these two pictures from the patio so it is looking at an angle from the right side of the yard. The yard is 5 feet higher at the right side property line on the right and the water run-off pattern is towards and in front of the shop site (I plan to re-grade the whole back yard when I am ready to finish grade from this project). I live in Oklahoma City and don't think there will be any freeze issues????
Thanks for any and all input from the forum.
Thanks
My question is based on my sloped yard and having to bring dirt in to get the site level (which is due to the drainage issues I have in the back yard).
I took these two pictures from the patio so it is looking at an angle from the right side of the yard. The yard is 5 feet higher at the right side property line on the right and the water run-off pattern is towards and in front of the shop site (I plan to re-grade the whole back yard when I am ready to finish grade from this project). I live in Oklahoma City and don't think there will be any freeze issues????
Thanks for any and all input from the forum.
Thanks